The project
- The requirement
- The school had a drilled borehole but needed equipment to use it, along with improved access to power. The project added solar power infrastructure and equipped the borehole, strengthening the school’s access to electricity and water.
- Our contribution
- Squirrellabs carried out the solar and borehole installations, bringing both services into one infrastructure project.
- The result
- Completed solar and borehole installations at the school.
